ARU design and building permits in Kingston

Most secondary unit delays happen before construction starts. We check zoning, design to the Ontario Building Code and manage the Kingston building permit, so your ARU is approved the first time and eligible for City incentives.

What does ARU design and permitting include?

It covers everything needed to get a building permit for a secondary unit: a zoning and servicing review, a layout you approve, permit-ready drawings to the Ontario Building Code, the application to the City of Kingston, answers to City comments, and the paperwork for any ARU incentive you apply for.

Our permit checklist

StageWhat we doWhat you get
Zoning reviewCheck your zone, setbacks, coverage, parking and constraint mapsA yes, no or "yes, if" answer
Servicing reviewCheck water service size, sewer and hydro capacityEarly warning on costly upgrades
DesignLayout options sized to your goal and budgetA plan you sign off
Permit drawingsSite plan, floor plans, elevations, sections, detailsA complete, code-compliant set
ApplicationSubmit and track the permit, answer City commentsAn issued building permit
IncentivesHelp with the Kingston ARU incentive applicationA complete application on file

Why the permit date matters in 2026

Kingston's ARU incentives are now waitlisted, and the City has said only projects with a building permit issued by December 1, 2026 will be considered. Getting a complete permit set in early is the best way to keep that option open. Details are in our Kingston ARU incentive program guide and on the City of Kingston incentive page.

Design for the unit you will actually build

We design with construction cost in mind, because we also build. That means layouts that keep plumbing runs short, use standard material sizes and avoid structural changes you do not need. See how that applies to a garden suite or a basement apartment.

Frequently asked questions

What drawings do I need for an ARU building permit in Kingston?

Typically a site plan, floor plans, elevations, sections and construction details that show Ontario Building Code compliance. Some projects also need structural, mechanical or energy efficiency details. We prepare the full set and respond to any City comments.

Can you just do the design and permit, and I build?

Yes. Some owners hire us for design and permits only and use their own contractor. You get permit-ready drawings and a permit issued in your name. Many later ask us to build as well, but there is no obligation.

What if my lot is in a constraint area?

Some Kingston areas, such as places with sewer capacity limits or natural hazards, do not allow ARUs as of right. A site-specific study or zoning amendment may be possible. We tell you early whether that path is realistic before you spend money on design.

Do I need a permit to legalize an existing unit?

Yes. Kingston requires existing secondary units to be legalized through a building permit, with an inspection that lists any deficiencies. We prepare the drawings for the legalization permit and can complete the work.

Find out what your property can hold

Send us your address and what you have in mind. We will check the zoning, flag any servicing issues and tell you which incentives you may qualify for, at no cost.